Publications and Research

Document Type

Book Chapter or Section

Publication Date

4-12-2023

Abstract

This paper covers aspects of planning and designing of deep shafts with reference to two water distribution shafts under construction in New York City. The new shafts will be sunk into soil and rock to a depth to connect to existing Queens-Brooklyn tunnel section of City Tunnel No. 3 (CT3). The inside diameter of the upper parts of both shafts is 14.9 meter. Artificial ground freezing is specified as preferred method of excavation support for the entire stretch in soil. Excavation in competent rock will be performed using drill and blast technique preceded by a pre-excavation grouting program. Membrane waterproofing with sectioning is prescribed to limit groundwater infiltration to dry chambers.

Comments

Expanding Underground. Knowledge and Passion to Make a Positive Impact on the World – Anagnostou, Benardos & Marinos (Eds) © 2023 The Author(s), ISBN 978-1-003-34803-0 Open Access: www.taylorfrancis.com, CC BY-NC-ND 4.0 license

Available for download on Friday, January 01, 2027

Share

COinS